Thursday, December 8, 2016

Team 1 IST 411 Command and Control meeting minutes

12-7-16
-Fixed the Interface.py and the CommandAndControl.py files.
-Got the files waiting on each other
-Tested the files on 2 raspberry pis and 3 xBees.

Wednesday, December 7, 2016

Team 6 - Safety and Access Control System Meeting

Wednesday, 12/7 - Google Hangouts

After the team leaders met to discuss and implement a structured template for our project presentation, our group edited our section by moving the information from our original slides while also deleting some. Additionally, we added:
  • Code snippets
  • A timeline of our milestones
  • A diagram representing how the keyless entry (Android App) works between the user, SSH connection and output

Team 1 Braking System Meeting Minute


Team 1 Meeting Minutes,

12/4/16  Sunday 1PM  - 5PM, 12/5/16 Monday 9 PM - 1 AM   12/6/16 Tuesday Class Time
Progress:

Finished Documentation


Final Android UI





Revising  PowerPoint.


Tuesday, December 6, 2016

Friday, December 2, 2016

IST Team 3 Climate Control meeting minutes

12/2 Meeting


  • We are almost finished all our documentation. We have maintenance documentation finished and just need to combine all the documents together.
  • PowerPoint presentation almost completed
Completed:
  1. Bluetooth is able to communicate with android device using two ports. We used threading to display the temperature as well as reading the temperature on the tablet. 
  2. Controlling the cooling fan and heating pad with our app by using bluetooth.
  3. If user decreases temperature then the A/C will be turned on
  4. If user increases temperature then the heat will be turned on



Current UI
Increasing temperature will turn on Heat


Decreasing temperature will turn on A/C

Thursday, December 1, 2016

IST Team 2 Monitoring and Logging minutes

Accomplished:

  • Discussed how we will be integrating with CNS
  • Worked out additional methods needed for passing messages to CNS
  • Created watchdog timer and tracking methods for system timeouts
To Do:
  • Integrate with CCS message queue/Threading code
  • Write test harness to simulate messages coming in from the queue
  • Test entire chain (CCS>MLS>CNS)

IST 411 Team 3 Connectivity and Notification meeting minutes

Team Meeting 11/30/16

  • Discussed with monitoring and logging team on how the message will be sent
  • Added CNSmonitoring file that utilizes the Message class to receive messages
  • Tested some methods to receive a message and read messages' payloads

IST 411 Command and Control Team 1 Meeting minutes

Meeting minutes 12/1/16
- Discussed the errors we have for the interface
- Slowly fixing errors one by one
- Stopped by IST 440 to see how the process is going
- Located our errors and consulted professor Joe Oakes for assistance