12-7-16
-Fixed the Interface.py and the CommandAndControl.py files.
-Got the files waiting on each other
-Tested the files on 2 raspberry pis and 3 xBees.
Thursday, December 8, 2016
Wednesday, December 7, 2016
Team 6 - Safety and Access Control System Meeting
Wednesday, 12/7 - Google Hangouts
After the team leaders met to discuss and implement a structured template for our project presentation, our group edited our section by moving the information from our original slides while also deleting some. Additionally, we added:
After the team leaders met to discuss and implement a structured template for our project presentation, our group edited our section by moving the information from our original slides while also deleting some. Additionally, we added:
- Code snippets
- A timeline of our milestones
- A diagram representing how the keyless entry (Android App) works between the user, SSH connection and output
Team 1 Braking System Meeting Minute
Team 1 Meeting Minutes,
12/4/16 Sunday 1PM - 5PM, 12/5/16 Monday 9 PM - 1 AM 12/6/16 Tuesday Class Time
Progress:
Finished Documentation
Final Android UI
Revising PowerPoint.
Tuesday, December 6, 2016
Team 6 - Safety and Access Control System Meeting
Monday, 12/5 - 132 Woodland
Our group met during Common Break and worked on our presentation.
Our group met during Common Break and worked on our presentation.
Friday, December 2, 2016
IST Team 3 Climate Control meeting minutes
12/2 Meeting
- We are almost finished all our documentation. We have maintenance documentation finished and just need to combine all the documents together.
- PowerPoint presentation almost completed
Completed:
- Bluetooth is able to communicate with android device using two ports. We used threading to display the temperature as well as reading the temperature on the tablet.
- Controlling the cooling fan and heating pad with our app by using bluetooth.
- If user decreases temperature then the A/C will be turned on
- If user increases temperature then the heat will be turned on
![]() |
| Current UI |
![]() |
| Increasing temperature will turn on Heat |
![]() |
| Decreasing temperature will turn on A/C |
Thursday, December 1, 2016
IST Team 2 Monitoring and Logging minutes
Accomplished:
- Discussed how we will be integrating with CNS
- Worked out additional methods needed for passing messages to CNS
- Created watchdog timer and tracking methods for system timeouts
To Do:
- Integrate with CCS message queue/Threading code
- Write test harness to simulate messages coming in from the queue
- Test entire chain (CCS>MLS>CNS)
IST 411 Team 3 Connectivity and Notification meeting minutes
Team Meeting 11/30/16
- Discussed with monitoring and logging team on how the message will be sent
- Added CNSmonitoring file that utilizes the Message class to receive messages
- Tested some methods to receive a message and read messages' payloads
IST 411 Command and Control Team 1 Meeting minutes
Meeting minutes 12/1/16
- Discussed the errors we have for the interface
- Slowly fixing errors one by one
- Stopped by IST 440 to see how the process is going
- Located our errors and consulted professor Joe Oakes for assistance
Subscribe to:
Comments (Atom)



